The products that are shipped from the Slaughterhouse and Printing House are processed in the Sorting (Pre-control) department and checked by our professional team. After the products that pass the control are paired, they are taken into production according to the order of operation on our lean system sewing belts.
It operates with 9 planting belts in a total of 8 thousand square meters of planting track. Our products that come out of planting are directed to the cleaning and control department. Our products that pass the control without any problems are transferred to the ironing and packaging department.